The Northern Lights were a common occurrence for our team. Definitely a tick off the bucket list.
With temperatures below -30 celsius and over 1m of snow; health & safety is more important than ever.
Lifting the tower sections of one of the 201 turbines constructed on Markbygden.
Manoeuvring a turbine blade with a length of over 60m.
Another beautiful backdrop featuring a sun halo in sun zero temperatures.
Unloading and positioning the tower sections ready for installation, overseen by our HHS Professionals Health & Safety Advisors.
For approximately 6 months of the year, Markbygden is covered in snow.
8 Siemens Gamesa 5X turbines were constructed at Knöstad wind farm in Southern Sweden.
Construction phase overseen by HHS Professionals HSE Advisors.
BMS LR1750 crane used for installation.
Fully constructed Siemens Gamesa 5X turbine.
Tower installation.
Project construction completed in Q1 2022.
From above: components have arrived and are unloaded ready for installation.
Pre-installation of tower sections, with a stunning backdrop.
Pre-installation phase from above with a hydraulic boom crane.
Blade C installed using the LG1750 mobile crane.
The fourth tower section is installed, five in total make up the complete tower.
All components installed, now for internal mechanical works before commissioning.
A drone image of the turbine tower sections, blades and nacelle. A total of 10 turbines have been constructed on these neighbouring sites.
Sunrise on the west coast and 6 of 10 Siemens Gamesa 5X wind turbines.
Although winter isn’t as harsh in Southern Sweden, working conditions can be extremely dangerous.
All of our HSE Advisors will receive a branded PPE kit to suit both summer and winter spring conditions.
A Mammoet crane being used to install a nacelle. All lifting operations are closely observed by our team of experiences HSE Advisors.
Another angle of the previous drone picture. Nacelle being secured by the installation top team before the main crane disconnects.
The lack of daylight doesn't stop us from working. With adequate lighting on the ground and internal lighting inside the nacelle, installations remains possible.
Project completion; 7 turbines from Femstenaberg installed with zero LTI's or accidents.
Grevekulla project consisted of eight Siemens Gamesa 5X turbines. The installation phase was overseen exclusively by HHS Professionals.
Another stunning backdrop for one of our latest projects.
Blade C: en route!
First turbine installed, only 38 to go!
Pre-installation phase commences at Tjarnas-Skutt, where 16 turbines will be installed in 2023.